Allan D. Sumpter                                                                                                                                     Virginia Department of Transportation

Charlottesville Residency Administrator                                                                                                                                     701 VDOT Way

                                                                                                                                                                                  Charlottesville, VA  22911

 

Charlottesville Residency Monthly Report

October 2007

 

 

Albemarle County BOS Action Items

 

David Slutzky

Ken Boyd

Dennis Rooker

Dave Wyant

Sally Thomas

Lindsay Dorrier

Construction

PM-7B-07

Rte. 618 Bridge over Hardware River superstructure replacement (0618-002-6018,SR01)

Bridge deck patch and repair service contract     

                                                                                                                        Active Construction Projects

Preliminary Engineering

Albemarle County

R/W is currently being negotiated and utilities have started to be relocated.  VDOT and Luck Stone met on September 28th.  Luck Stone is currently receiving bids on the project and VDOT, Luck Stone, and potential contractors had a follow up meeting to discuss more specific construction items.

The right-of-way phase continues on this project.  Right of Way offers have been made to CATEC and Wetsel and are pending.  A Right of Way revision is underway as requested by the City of Charlottesville.  Once the revision is complete, an offer will be made to the city.

Project funding update:  Additional funding as a result of HB 3202 has enabled the city to fully fund this project.  The most significant remaining issue is formal city agreement to provide temporary easements for construction of the project. 

The project has been split into two phases.  The first phase from route 240 to about 0.5 miles east of route 684 has been scheduled for advertisement in November of 2010.

A preliminary schedule has been developed for the project estimating that the right of way phase will need approximately 15 months to complete. It is estimated that the plans will be ready for the right of way phase to begin in December of 2008 and an estimated advertisement date in early 2011 is expected.

The project is waiting for the survey to be completed.

A citizen information meeting was held on October 11, 2007, at Spring Hill Baptist Church on Fray’s

Mill Road.  There were approximately 100 attendees at the meeting and VDOT has received over 100

comment sheets from the public.  The comments are being evaluated to determine the community’s

preference for the potential alignments.

 

The monthly update to the rural rustic program is attached to this report.

 

 

Planning, Permits and Land Development

Land Development Items

Total This Month

Total This Fiscal Year

Special Use Permits and Rezoning Application Review

6

26

Site Plan Reviews for new Subdivisions

20

57

New Entrance Plan Reviews

23

43

Total Permits Processed

80

254

Utility Permits Processed

15

50

Inspection of new Subdivision Street conducted

35

151

Inspection of new entrance conducted

107

392

Miles of Street Accepted in the State System

.21

2.15

 

Traffic Engineering

Albemarle - Completed

 

 

RTE

LOCATION

REQUEST

ACTION

Rt 53

Section of route east and west of entrance to Monticello

Safety & operational review

Additional warning signs along with pavement messages to be installed in next few weeks

Rt 1090 (Lego Drive)

Entire route

Traffic calming

With County Staff for citizens approval

Rt 854 (Carrsbrook)

Entire route

Traffic calming

Met w/county staff; county staff meeting with citizens; petitions pending

 

 

 

 

 

Albemarle – Being reviewed

 

 

RTE

LOCATION

REQUEST

STATUS

 Rt 29

@ post office entrance

Safety review for entrance

TE reviewing

Rt 631 (Rio)/Waldorf School/Pen Park

Intersection

Being reviewed for cross walk and pedestrian crossing

TE reviewing

250 (Ivy Rd)

Near intersection with 682

Review of passing zone on Route 250

Finalizing sketch

250 (Richmond Rd)

I-64 interchange to High/River Rd intersection in Charlottesville

Coordinate signals on this corridor

Project in preliminary stages of scoping and design.  Meeting with City to include signal at Rt 250/High Street.  Additional counts at some intersections to be taken and additional time/delay study runs to be taken.

Rt 688 (Midway)

Off Miller School Road

Review for speed limit posting on un-posted road

TE talked with citizen, sketch being prepared

 Rt 29

Between Polo Grounds & Hollymead

Speed limit review

TE reviewing

Rt 20

Int w/ 712

Operational & safety concerns

TE reviewing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maintenance work completed

Albemarle County

(Cindy Ln), and 22 (Louisa Rd.).  Cold Patch Routes 691 (Jarmans Gap) and 743 (Earlysville Rd.).

Shoulder Repair Rt. 1470 (Franklin Ct.).

 640 (Turkey Sag Rd.) 712 (Plank Rd.), 713 (Dyers Mill Rd.) 722 (Old GreeneMtn.), 824 Patterson Mill

Rd.), 688 (Midway Rd.), 688 (Midway Rd.), 766 (Pea Ridge Rd.), 662 (Bleakhouse Rd.), 606 (Dickerson

Rd.) 668 (Fox Mtn. Rd.), 643 (Rio Mills Rd.).

714 (Riding Club Rd.), 778 (Johnson Rd.), 633 (Cove Garden Rd.), 708 (Red Hill Rd.), 810 (Blackwells

Hollow), 1403 (Berkmar Dr.), 672 (Blufton Rd.), 668 (Fox Mtn. Rd.), 1489 (Biltmore Dr.), 1452 Westfield

Rd.), 884 (Mint Springs Rd.) 637 (Dickwoods Rd.), 682 (Broad Axe Rd.), 824 (Patterson Mill Rd.)

787 (Gillums Ridge Rd.), 250 (Rockfish Gap), 240 (Three Chopt Rd.), 29 (Monacan Trial), 759 (Three

Chopt Rd.), 641 (Echo Valley Rd.).

810 (Blackwells Hollow), 665 (Buck Mtn. Rd.), 601 (Free Union Rd.), (250 Ivy Rd.), Rivanna AHQ lot,

736 (White Mtn. Rd.) Charlottesville Residency Lot, 760 (Red Hill School Rd.), 712 (Plank Rd.),

630 (Green Creek Rd.), 631 (Rio Rd.), 719 (Alberene Rd.), 717 (Old Sand Rd.) 810

(Whitehall Rd.), 682 (Broad Axe Rd.), 611 (Jarmans Gap Rd.), 769 (Rocky Hollow Rd.),

612 (Hammocks Gap Rd.), 621 (Wolf Trap Rd.), 741 (Mossing Ford Rd.), 600 (Stoney Point Pass),

700 (Watts Farm Rd.), 640 (Turkey Sag Rd.), 1428 (Huntington Rd.) 631 (5th St Ext’d)

780 (Old Lynchburg Rd.)

(Dry Bridge Rd.), 614 (Sugar Hollow Rd.) 635 (Miller School Rd.), 1021 (Garthfield La.)

20 (Scottsville Rd.), 810 (Whitehall Rd.), 712 (Dyers Mill Rd.).

      713 (Glendower Rd.), 712 (Plank Rd.) 722 (Old Green Mountain Rd.), 612 Hammocks Gap Rd.),

      662 (Bleakhouse Rd.), 674 (Clark Rd.), 766 (Pea Ridge Rd.), 768 (Ridge Rd.) 684 (Half Mile

Branch), 689 (Pounding Creek), 682 (Broad Axe Rd.) 688(Midway Rd.), 745 (Poor House Rd.),

760 (Red Hill School Rd.) 778 (Johnson Rd.), 633 (CoveGarden Rd.), 723 (Sharon Rd.), 792

(Stump Town Ln.), 793 (Serene Ln.) 795 (James Monroe Pkwy.), 712 (Plank Rd.).

(Bishop Hill Rd.)

 

Planned Maintenance work – August 2007

 

Maintenance Budget

10/25/2007

 

Rural Rustic Program 2007

Albemarle County

 

 

Rte 647 (Maxfield Road)

 

Rte 640 (Gilbert Station)

 

 

 

Projects Completed

 

 