Allan D. Sumpter                                                                                                                                     Virginia Department of Transportation

Charlottesville Residency Administrator                                                                                                                                     701 VDOT Way

                                                                                                                                                                                  Charlottesville, VA  22911

 

Charlottesville Residency Monthly Report


September 2007

 

 

Albemarle County BOS Action Items

 

David Slutzky

Ken Boyd

 

Dennis Rooker

 

Dave Wyant

Sally Thomas

Lindsay Dorrier

 

Construction                                                                                               Active Construction Projects

Contractor completed trench widening and paving on Rte. 654 (Barracks Road).  Contractor completed Rte. 29 NBL from Rte. 649(Proffit Road) to the Greene County.   

Preliminary Engineering

Albemarle County

R/W is currently being negotiated and utilities have started to be relocated.  VDOT, Albemarle County and Luck Stone met on July 20, 2007 to follow up discussions on the construction funding for this project.  Luck Stone has received plans for the project and is currently reviewing them.  VDOT has drafted a Memorandum of Agreement for the project and will present the document to Luck Stone for review at the meeting scheduled for September 28.

The right-of-way phase continues on this project.  A right of way offer is pending for the CATEC property.  There are still outstanding issues on the Wetsel and City of Charlottesville properties.

Project funding update:  Additional funding as a result of HB 3202 has enabled the city to fully fund this project.  The most significant remaining issue is formal city agreement to provide temporary easements for construction of the project. 

The survey has been updated to reflect recent development along the project.  The Tea Room property has been cleared and design is proceeding.  Although the final schedule has not yet been developed, an advertisement date in the later part of 2010 is expected.

Scoping has been completed.  Preliminary engineering has started and coordination with utilities is important in the development of the project.  A preliminary field inspection meeting is expected to be held in the late fall of 2007.

Aerial survey is scheduled to be available in October 2007.

A citizen information meeting has been scheduled for Thursday, October 11, 2007, at Spring Hill Baptist

Church on Fray’s Mill Road.  The time will be from 5:00 PM to 7:00 PM.  The informational brochure

has been published and is in circulation throughout the community.

 

 

 

The monthly update to the rural rustic program is attached to this report.

 

 

Planning, Permits and Land Development

Land Development Items

Total This Month

Total This Fiscal Year

Special Use Permits and Rezoning Application Review

10

20

Site Plan Reviews for new Subdivisions

15

37

New Entrance Plan Reviews

5

20

Total Permits Processed

85

174

Utility Permits Processed

20

35

Inspection of new Subdivision Street conducted

51

116

Inspection of new entrance conducted

165

285

Miles of Street Accepted in the State System

1.16

1.94

 

Traffic Engineering

Albemarle - Completed

 

 

RTE

LOCATION

REQUEST

ACTION

Rt 53

Section of route east and west of entrance to Monticello

Safety & operational review

Additional warning signs along with pavement messages to be installed in near future

Rt 1090 (Lego Drive)

Entire route

Traffic calming

Final design submitted to County Staff

Rt 1521 (Powell Cr Dr)

Section of route where traffic calming measures installed

Perform follow up evaluation of the effectiveness of the traffic calming measures

Complete; recommendations to county staff

Rt 854 (Carrsbrook)

Entire route

Traffic calming

Study results to county staff; road is eligible

 

 

 

 

 

 

Albemarle – Being reviewed

 

 

RTE

LOCATION

REQUEST

STATUS

 Rt 29

@ post office entrance

Safety review for entrance

TE reviewing

Rt 631 (Rio)/Waldorf School/Pen Park

Intersection

Being reviewed for cross walk and pedestrian crossing

TE reviewing

250 (Ivy Rd)

Near intersection with 682

Review of passing zone on Route 250

Finalizing sketch

250 (Richmond Rd)

I-64 interchange to High/River Rd intersection in Charlottesville

Coordinate signals on this corridor

Project in preliminary stages of scoping and design.  Meeting with City to include signal at Rt 250/High Street.  Additional counts at some intersections to be taken and additional time/delay study runs to be taken.

Rt 688 (Midway)

Off Miller School Road

Review for speed limit posting on un-posted road

TE reviewing

 Rt 29

Between Polo Grounds & Hollymead

Speed limit review

TE reviewing

Rt 20

Int w/ 712

Operational & safety concerns

TE reviewing

 


 

 

Maintenance work completed

Albemarle County

Rd.).  Cold Patch Routes 708 (Dry Bridge Rd), 692 (Plank Rd.), 691 (Jarmans Gap), 676 (Woodlands Rd.),

1075 (Shagbark Ln.).  Plant mix Route 677 (Bloomfield Rd.).

Graded and replaced stone on Routes 600 (Stoney Point Pass), 784 (Doctors Crossing & Burnt Mill Rd.),

640 (Turkey Sag Rd.), 611 (Jarman’s Gap Rd.), 692 (Plank Rd.), 636 (Batesville Rd.), 682 (Gillums Ridge

Rd.), 811 (Jones Mill Rd.), 745 (Arrowhead Valley), 824 Patterson Mill Rd.), 688 (Midway Rd.), 684 Mint

Springs Rd.), 637 (Dick Woods Rd.) 691 (Ortman Rd.), 776 (Buck Mtn. Ford Rd.) 606 (Dickerson Rd.),

672 (Blufton Rd.), 673 (Breakheart Rd.), 668 (Fox Mtn. Rd.), 765 (Innesfree), 643 (Rio Mills Rd.).  Grade

rental properties driveways.  Pull Shoulders Rt. 29, 722 (Old Green Mtn. Rd.), 723 (Sharon Rd.), 728 (Ed

Jones Rd.), 761 (Briery Creek Rd.), 670 (Damon Rd.), 760 (Red Hill School Rd.), 712 (Plank Rd.), 711

(Burton Rd.), 856 (Burton Rd.), 856 (Burton Ln.), 697 (Sutherland Rd.), 754 (Loving Rd.), 713 (Glendower

Rd.), 717 (Secretarys Sand Rd.), 704 (Fortune Ln.) and 737 (Mountain Vista Rd.)

Rd.), 627(Carters Mountain), 600 (Stoney Point Pass), 640 (Turkey Sag Rd.), 612 (Hammocks Gap Rd.) and

769 (Rocky Hollow Rd.)

F179 (Hansens Mtn. Rd.), 1090 (Lego Dr.), 1146 (Hunters Way), 1109 (Glenorchy Dr.), 808 (Running

Deer Dr.), 731 (Keswick Dr.), 781 (Sunset Ave.), 780 (Old Lynchburg Rd.), 796 (Brooksville Rd.), 688

(Midway Rd.), 691 (Jarman Gap Rd.), 689 (Pounding Creek Rd.), 810 (Whitehall Rd.), Yancey Mills

 HQTR., 676 (Owensville Rd.), 678 (Decca La.), 614 (Garth Rd.), 795 (Blenheim Rd.),

742 (Avon St. Ext.), 1135 (Willow Lake Dr.), 1137 (Brookhill Ave.), 388 (College Dr.), 1150 (Mill

Creek Dr.), 1802 (Lenora Rd.), 1803 (David Rd.), 1801 (Forrest Rd.), 1800 (Marshall Ct.), 708

(Secretarys Rd.), 712 (Coles Rolling Rd.), 642 (Red Hill Depot Rd.), 706 (Dudley Mountain Rd.),

692 (Plank Rd.), 711 (Burton Rd.), 856 (Burton Ln.), 760 (Red Hill School Rd.), 602

(Howardsville Tpke.), 626 (James River Rd.), 715 (Esmont Rd.), 712 (Plank Rd.), 29 (Monacan

Trail), 6 (Irish Rd.), 20 (Scottsville Rd.), 627 (Carters Mountain Rd.), 618 (Jefferson Mill Rd.),

622 (Albevanna Spring Rd.), 726 (James River Rd.), 717 (Secretarys Sand Rd.), 630 (Green Creek

Rd.), 727 (Blenheim Rd.) and 735 (Mt. Alto Rd.).

Tree cleanup on Routes 29 (Monacan Trail), 636 (Craigs Store Rd.), 691 (Ortman Rd.), 708 (Dry Bridge

Rd.), 637 (Dick Woods Rd.), 635 (Miller School Rd.), 692 (Plank Rd.), 606 (Dickerson Rd.), 664

(Markwood Rd.),  6 (Irish Rd.), 722 (Old Green Mountain Rd.), 800 (Schuyler Rd.), 626 (James River Rd.)

20 (Scottsville Rd.) and 717 (Secretarys Sand Rd.).

      Ford Rd.), 713 (Glendower Rd.), 712 (Plank Rd.), 722 (Old Green Mountain Rd.), 704 (Fortune

Ln.), 697 (Sutherland Rd.), and 754 Loving Rd.).

Town Rd.).

 

Planned Maintenance work – August 2007

 

Maintenance Budget

9/26/2007

 

Rural Rustic Program 2007

Albemarle County

 

 

Rte 734 (Bishop Hill Road

Rte 647 (Maxfield Road)

Rte 640 (Gilbert Station)

 

 

 

 