Allan D. Sumpter
Virginia Department of Transportation
Charlottesville
Residency
Administrator
701 VDOT Way
Charlottesville, VA 22911
Charlottesville
Residency Monthly Report
April 2007
Albemarle County BOS Action Items
David Slutzky
- The guardrail hit at Greenbrier and Hillsdale has been
repaired.
- Sidewalk repairs on Hillsdale – Residency has been
reviewing sidewalk repair needs county wide in hopes of developing a
contract for multiple locations, which will help decrease unit costs.
- Signal adjustments at Hydraulic Road have been
completed.
Ken Boyd
- Rural Rustics: Work on Route 769 (Rocky Hollow) is
ongoing. Others are in the administrative process, including the securing
of environmental permits.
- Route 20/250 – Traffic Engineering staff is continuing
to review this intersection for timing adjustments at peak hours in morning
and evenings.
Dennis Rooker
- The repair work to the guardrail hit on Roslyn Ridge
is awaiting utility clearance. It is expected that this work will be
completed by mid-May.
- Transportation Bill – The residency is waiting to
receive final allocations for the secondary system as a result of the
passage of HB 3202. Preliminary numbers indicate that Albemarle County will
receive approximately $7.1 million in additional funds during the
FY2008-2012 period.
Dave Wyant
- A citizen information meeting has been scheduled on
May 8th to discuss replacement scenarios for the Advance Mills Bridge.
Alignment options will be discussed in general terms along with the
preliminary engineering process for a project of this nature. This project
is in the very early stages. No plans have been developed and environmental
impact studies have not begun. As the project develops, there will be
official public hearings held to receive comment from the public.
Sally Thomas
- Belair Market Signal along Route 250 – Materials are
backordered for installation of video detection cameras. Traffic
Engineering knows this location is a priority and will begin work as soon as
possible.
Lindsay Dorrier
- Biscuit Run – VDOT staff continuing to assist County
Staff in development of acceptable proffers.
Construction
Active Construction Projects
- Project No. (NFO)PM07-056-177, C501 (Rte. 29 SBL
Bridge over Rapidan River deck repair and latex concrete overlay) Contractor
began work on 3-28 beginning with guardrail removal and reinstallation. This
activity requires periodic lane closures controlled with flag persons.
- Project No. SS-7B-07 (Asphalt Slurry Seal) Contractor
began work on 3-27 applying slurry seal to the scheduled routes in the west
area of Albemarle County.
Preliminary Engineering
Albemarle
County
- Route 22 / 250
Intersection Improvements, 0022-002-104, C501
R/W is currently being negotiated. VDOT, Albemarle County and Luck Stone met on
March 30th to discuss the construction funding for this project. A
follow up meeting is scheduled for July 20th, 2007.
- Route 631 Meadow
Creek Parkway, 0631-002-128, C502, B612, B657
R/W phase update: Right-of-Way appraisals and acquisitions continue. Still on
schedule for R/W to be clear by November 2007 and utility relocations to begin.
This project remains on schedule for a June 2008 advertisement.
- Route 631, Meadow
Creek Parkway, U000-104-102 (City portion)
Project funding update: Estimated funding shortfall at this time is $5.1
million. Potential cost reductions and additional funding have been identified
for $3.9 million leaving total shortfall at $1.2 million
- Route 691 Jarmans
Gap Road, 0691-002-158, C501
Administrative functions related to the phasing of this project are still
ongoing. An exact advertisement date cannot be firmly established until final
secondary six year plan funding allocations are in place. At present projected
allocations, it is expected the project will be advertised in late 2008 or early
2009.
- Route 656
Georgetown Road, 0656-002-254, C501
Aerial Survey completed. Data conversion for use in design is underway and
should be completed in late April.
- Route 643 Rio Mills
Road, 0643-002-P76, N501
The curve has been staked in the field and a scoping meeting has occurred.
Environmental has evaluated impacts and residency staff is developing
environmental permits and box culvert information. Aerial survey has been
completed and is being compiled.
- Route 769 Rocky
Hollow Road, 0769-002-P89, N501
Please see attached report regarding rural
rustic program.
Greene County
- Route 627 Bacon
Hollow Road, 0627-039-195,
C501
The project advertisement date will be set for the fall of 2007. The estimate
has been revised and funding for the project is in place.
Planning, Permits and Land Development
|
Land Development Items |
Total This Month |
Total This Fiscal Year |
|
Special Use
Permits and Rezoning Application Review |
4 |
44 |
|
Site Plan
Reviews for new Subdivisions |
18 |
106 |
|
New Entrance
Plan Reviews |
11 |
138 |
|
|
79 |
741 |
|
Utility Permits
Processed |
16 |
117 |
|
Inspection of
new Subdivision Street conducted |
17 |
101 |
|
Inspection of
new entrance conducted |
102 |
1011 |
|
Miles of Street
Accepted in the State System |
0.07 |
4.35 |
Traffic Engineering
|
Albemarle
- Completed |
|
|
|
RTE |
LOCATION |
REQUEST |
ACTION |
|
Albemarle
– Being reviewed |
|
|
|
RTE |
LOCATION |
REQUEST |
STATUS |
|
29 |
Post Office |
Mark Curb for safety |
Residency is taking
care of |
|
631(5th
St) |
Near County Bldg |
Painting for Bus
Stop |
To Paint Crew on
4/24/07 |
|
53 |
South of Monticello |
Place Chevrons for
curve |
Residency is taking
care of |
|
614 (Sugar Hollow
Rd) |
At bridge |
Place Chevrons for
parking near bridge |
Residency is taking
care of |
|
708 (Red Hill) |
Red hill Quarry |
Request to place
Trucks entering sign and trim trees |
Trees cut on
4/23/07, signs ordered |
|
Greene – Being
reviewed |
|
|
|
RTE |
LOCATION |
REQUEST |
ACTION |
Maintenance work completed
Albemarle County
-
Patching operations completed on Routes 29,
240, 250, 600 (Stony Point Pass), 610 (Lonesome Mtn),
621
(Wolftrap), 631 (Rio/5th St/Old Lynchburg), 641 (Burnley
Station), 645 (Magnolia), 682 (Broad Axe),
712
(Plank), 727 (Blenheim), 743 (Earlysville), 810 (Crozet), 820 (Buckingham
Cir) and 825
(Yancey Mill Ln).
-
Graded and replaced stone on Routes 612
(Hammocks Gap), 636 (Batesville), 637 (Dickwoods), 640
(Gilbert Station), 641 (Burnley Station), 643
(Rio Mills), 661 (Reas Ford), 668 (Fox Mtn), 671 (Ballards
Mill), 672 (Via), 674 (Clark), 678 (Ridge), 689
(Pounding Creek), 702 (Reservoir), 725 (Dawsons Mill)
736 (White Mtn), 758 (Smith), 762 (Rose Hill
Church), 766 (Pea Ridge), 774 (Appleberry Mtn), 778
(Johnsons), 813 (Starlight) and 821 (Blufton
Mill).
-
Litter pickup on Rt 6, 29, 250, 618 (Martin
Kings), 620 (Rolling), 627 (Porters), 631 (Old Lynchburg),
632 (Faber), 712 (Plank), 715 (Esmont), 717
(Secretary Sand), and 800 (Schuyler).
-
Cleared pipes and ditch work on Routes 29,
601 (Garth), 640 (Gilbert Station), 646 (Lovers Ln),
743 (Earlysville), 795 (Presidents), 810
(Crozet), 831 (Tompkins), 854 (Carrsbrook), 1452 (Westfield)
-
Mowing Routes 231 and 708 (Red Hill).
-
Tree cleanup on various routes throughout
the county due to storm.
-
Cleaned up from rain, high water and wind
damage across the county. Cleaned up equipment.
-
Dust Control on Routes 20, 606 (Dickerson),
633 (Cove Garden), 643 (Rio Mills), 668 (Fox Mtn),
671 (Millington), and 674 (Clark).
- Bridge work on Routes 600
(Watts Passage) and 627 (Carters Mtn).
Greene County
- Graded and replaced
stone on Routes 603 (Bingham Mtn), 624 (Beazley), 626 (Snow Mtn), 629 (Welsh
Run), 630 (Rosebrook), 632 (Wyatt Mtn), 634 (Mutton Hollow), 637 (Pocasan
Mtn), 638 (Teel Mtn), 642 (Taylor Mtn) and 806.
- Dust control on Routes
603 (Bingham Mtn), 624 (Beazley), 626 (Snow Mtn), 629 (Welsh Run), 630 (Rosebrook),
632 (Wyatt Mtn), 634 (Mutton Hollow), 637 (Pocasan Mtn), 638 (Teel Mtn), 642
(Taylor Mtn) and 806.
- Ditch and pipe
cleaning on Routes 29, 33, 604 (Celt), 632 (Wyatt Mtn) and 810 (Dyke).
- Patching operations on
Routes 33, 604 (Celt), 609 (Fredericksburg), 618 (Heights Hill), 810 (Dyke)
1143 and 1152 (Hillcrest).
- Entrance pipe
installed on Rt 609 (Fredericksburg).
- Tree/brush cutting on
Rt 621 (South River), 638 (Turkey Ridge) and 645 (Moore).
- High wind damage
across the county. Cleaned up equipment after event.
- Bridge work on Routes
603 (Bingham Mtn), 604 (Celt), 633 (Amicus) and 646 (Garth).
Planned Maintenance work – May 2007
-
Guardrail mowing, machining and patching on
various routes in Albemarle and Greene County.
-
Preparing for surface treatment schedules.
-
Installing pipes, ditching, tree removal,
grading on Route 769 (Rocky Hollow) for Rural Rustic Program.
- Route 646 (Garth)
bridge replacement work continues in Greene County.
Maintenance Budget

Return to regular
agenda