APPALACHIAN POWER COMPANY 2nd Revision of
d/b/a American Electric Power Sheet No. 1-1
SCHEDULE S.G.S. P.A.
(Small General Service – Public Authority)
AVAILABILITY OF SERVICE
Available for general service to municipal corporations and state governmental entities, excluding Public Housing Authorities and the Commonwealth of Virginia, as those terms are used in §§56-232 and 234 of the Code of Virginia and in pertinent decisions of the Supreme Court of Virginia, with normal maximum electrical capacity requirements of 25 KW or less per month who take Public Authority Service from the Company.
When a customer being served under this Schedule exceeds a normal maximum requirement of 25 KW per month for more than two (2) months during the past twelve (12) months, the customer will be placed on the appropriate Public Authority Schedule.
MONTHLY RATE (Schedule Code 232 – Secondary Voltage; Schedule Code 235 – Primary Voltage)
|
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
Customer Charge ($) |
-- |
-- |
-- |
9.50 |
9.50 |
|
Energy Charge (¢/kWh) |
1.399 |
0.368 |
0.092 |
1.377 |
3.236 |
|
Levelized Fuel Factor (¢/kWh) |
1.300 |
-- |
-- |
-- |
1.300 |
MINIMUM CHARGE
This Schedule is subject to a minimum monthly charge equal to the Customer Charge.
Bills are due upon presentation and payable by mail, checkless payment plan, electronic payment plan, or at authorized payment agents of the Company by the next bill date. On all accounts not so paid, a charge of 1½% per month will be applied to any account balances not received by the Company by the next bill date. If the Company fails to mail bills promptly after the billing date, the due date will be extended accordingly. The customer may designate its billing address.
The term shall be as contained in the agreement for electric service, between the Company and each city, county, and town governmental authority, for service after July 1, 2002. Further written agreements may be required pursuant to the Extension of Service provision of that agreement.
This Schedule is subject to all terms and conditions contained in the agreement for electric service, between the Company and each city, county, and town governmental authority, for service after July 1, 2002.
Customers with cogeneration and/or small power production facilities shall take service by special agreement with the Company.
d/b/a American Electric Power Sheet No. 1-2
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE S.G.S. P.A.
(Small General Service – Public Authority)
(continued)
LOAD MANAGEMENT TIME-OF-DAY PROVISION
Available to customers who use energy storage devices with time-differentiated load characteristics approved by the Company, such as electric thermal storage space heating and/or cooling systems and water heaters, which consume electrical energy only during off-peak hours specified by the Company and store energy for use during on-peak hours. A time-of-day meter is required to take service under this provision.
Customers who desire to separately wire their energy storage load to a time-of-day meter and their general-use load to a standard meter shall receive service under the appropriate provisions of the Public Authority Schedule.
Monthly Rate:
|
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
Customer Charge ($) |
-- |
-- |
-- |
11.00 |
11.00 |
|
Energy Charge (¢/kWh) |
|
|
|
|
|
|
All metered kWh during the on-peak billing period |
1.351 |
0.833 |
0.164 |
2.468 |
4.816 |
|
All metered kWh during the off-peak billing period |
1.222 |
-- |
-- |
-- |
1.222 |
|
Levelized Fuel Factor (¢/kWh) |
1.300 |
-- |
-- |
-- |
1.300 |
For the purpose of this provision, the on-peak billing period is defined as 7 a.m. to 8 p.m., local time, for all weekdays, Monday through Friday. The off-peak billing period is defined as 8 p.m. to 7 a.m., local time, for all weekdays, all hours of the day on Saturdays and Sundays, and the legally observed holidays of New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
The Company reserves the right to inspect at all reasonable times the energy storage devices which qualify for service under this provision, and to ascertain by any reasonable means that the time-differentiated load characteristics of such devices meet the Company's specifications. If the Company finds that, in its sole judgment, the availability conditions of this provision are being violated, it may discontinue billing the customer under this provision and commence billing under the appropriate Public Authority Schedule.
This provision is subject to the Terms and Conditions of Schedule S.G.S. P.A.
APPALACHIAN POWER COMPANY 2nd Revision of
d/b/a American Electric Power Sheet No. 1-3
SCHEDULE S.G.S. P.A.
(Small General Service – Public Authority)
(continued)
OPTIONAL UNMETERED SERVICE PROVISION (Schedule Code 212)
Available to customers who qualify for Schedule S.G.S. P.A. and use the Company’s service for small fixed electrical loads such as traffic signals and signboards which can be served by a standard service drop from the Company’s existing secondary distribution system. This service will be furnished at the option of the Company.
Each separate service delivery point shall be considered a location and shall be separately billed under the service agreement. In the event one customer has several accounts for like service, the Company may meter one account to determine the appropriate kilowatt-hour usage applicable to each of the accounts.
The customer shall furnish switching equipment satisfactory to the Company. The customer shall notify the Company in advance of every change in connected load, and the Company reserves the right to inspect the customer’s equipment at any time to verify the actual load. In the event of the customer’s failure to notify the Company of an increase in load, the Company reserves the right to refuse to serve the location thereafter under this provision, and shall be entitled to bill the customer retroactively on the basis of the increased load for the full period such load was connected plus three months.
Calculated energy use per month shall be equal to the capacity specified for the location times the number of days in the billing period times the specified hours of operation. Such calculated energy shall then be billed at the following monthly rate:
|
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
Customer Charge ($) |
-- |
-- |
-- |
7.00 |
7.00 |
|
Energy Charge (¢/kWh) |
1.399 |
0.368 |
0.092 |
1.377 |
3.236 |
|
Levelized Fuel Factor (¢/kWh) |
1.300 |
-- |
-- |
-- |
1.300 |
This provision is subject to the Terms and Conditions of Schedule S.G.S. P.A.
APPALACHIAN POWER COMPANY Sheet No. 2-1
d/b/a American Electric Power
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE M.G.S. P.A.
(Medium General Service – Public Authority)
AVAILABILITY OF SERVICE
Available for general service to municipal corporations and state governmental entities, excluding Public Housing Authorities and the Commonwealth of Virginia, as those terms are used in §§56-232 and 234 of the Code of Virginia and in pertinent decisions of the Supreme Court of Virginia, who take Public Authority Service from the Company with normal maximum demands exceeding 25 KW per month for more than two (2) months during the past twelve (12) months, but less than 1,000 KW per month.
When a customer being served under this Schedule establishes or exceeds a normal maximum requirement of 1,000 KW per month, the customer will be placed on the appropriate L.P.S.-T.O.D. P.A. Schedule.
MONTHLY RATE
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
216 |
Secondary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
18.00 |
18.00 |
|
|
Demand Charge ($/KW) |
0.00 |
0.00 |
0.00 |
3.42 |
3.42 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
-- |
1.99 |
1.99 |
|
|
Energy Charge (¢/KWH) |
1.789 |
0.501 |
0.139 |
0.055 |
2.484 |
|
|
Maximum Energy Charge (¢/KWH) |
1.962 |
0.549 |
0.152 |
10.337 |
13.000 |
|
218 |
Primary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
55.00 |
55.00 |
|
|
Demand Charge ($/KW) |
0.00 |
0.00 |
0.00 |
2.65 |
2.65 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
-- |
1.40 |
1.40 |
|
|
Energy Charge (¢/KWH) |
1.737 |
0.487 |
0.138 |
0.051 |
2.413 |
|
|
Maximum Energy Charge (¢/KWH) |
2.334 |
0.655 |
0.185 |
9.826 |
13.000 |
|
245 |
Subtransmission Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
55.00 |
55.00 |
|
|
Demand Charge ($/KW) |
0.00 |
0.00 |
0.00 |
1.72 |
1.72 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
-- |
0.76 |
0.76 |
|
|
Energy Charge (¢/KWH) |
1.707 |
0.478 |
0.134 |
0.051 |
2.370 |
|
|
Maximum Energy Charge (¢/KWH) |
3.133 |
0.877 |
0.246 |
8.744 |
13.000 |
APPALACHIAN POWER COMPANY 2nd Revision of
d/b/a American Electric Power Sheet No. 2-2
SCHEDULE M.G.S. P.A.
(Medium General Service – Public Authority)
(continued)
MONTHLY RATE (Cont’d)
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
|
Transmission Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
55.00 |
55.00 |
|
|
Demand Charge ($/KW) |
0.00 |
0.00 |
0.00 |
1.44 |
1.44 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
-- |
0.59 |
0.59 |
|
|
Energy Charge (¢/KWH) |
1.687 |
0.472 |
0.132 |
0.051 |
2.342 |
|
|
Maximum Energy Charge (¢/KWH) |
3.488 |
0.976 |
0.273 |
8.263 |
13.000 |
Applicable to customers 300 KW or greater:
Distribution Reactive Demand Charge for each KVAR of leading or
lagging reactive demand in excess of 50% of the KW metered demand . . . . $0.75 per KVAR
Generation Levelized Fuel Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.300¢ per KWH
MINIMUM AND MAXIMUM CHARGES
Bills computed under the above rate are subject to the operation of Minimum and Maximum Charge provisions as follows:
(a) Minimum Charge - For demand accounts up to 100 KW - the Customer Charge and all applicable adjustments. For demand accounts over 100 KW - the sum of the Customer Charge, the product of the Demand Charge and the monthly billing demand, and all applicable adjustments.
(b) Maximum Charge - The sum of the Customer Charge, the product of the Maximum Energy Charge and the metered energy, and all applicable adjustments. This provision shall not reduce the charge below the amount specified in the Minimum Charge provision above, (a).
PAYMENT
Bills are due upon presentation and payable by mail, checkless payment plan, electronic payment plan, or at authorized payment agents of the Company by the next bill date. On all accounts not so paid, a charge of 1½% per month will be applied to any account balances not received by the Company by the next bill date. If the Company fails to mail bills promptly after the billing date, the due date will be extended accordingly. The customer may designate its billing address.
d/b/a American Electric Power
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE M.G.S. P.A.
(Medium General Service – Public Authority)
(continued)
MEASUREMENT AND DETERMINATION OF BILLING DEMAND
The billing demand in KW shall be taken each month as the single highest 15-minute peak in KW as registered during the month by a demand meter or indicator.
For accounts over 100 KW, the monthly billing demand established hereunder shall not be less than 60% of the greater of (a) the customer’s contract capacity in excess of 100 KW, or (b) the customer’s highest previously established monthly billing demand during the past 11 months in excess of 100 KW.
For accounts 300 KW or greater, the reactive demand in KVAR shall be taken each month as the single highest 15-minute peak in KVAR as registered during the month by a demand meter or indicator.
Billing demands shall be rounded to the nearest whole KW and KVAR.
OPTIONAL TIME-OF-DAY PROVISION
Available to customers who operate primarily during the off-peak period (as set forth below) and request the installation of time-of-day metering in order to receive service under this provision. The customer shall be required to pay any necessary additional metering cost.
For the purpose of this provision, the monthly billing demand as defined above shall be determined during the on-peak period. The off-peak excess demand shall be the amount by which the demand created during the off-peak period exceeds the monthly billing demand.
For the purpose of this provision, the on-peak billing period is defined as 7 a.m. to 8 p.m., local time, for all weekdays, Monday through Friday. The off-peak billing period is defined as 8 p.m. to 7 a.m., local time, for all weekdays, all hours of the day on Saturdays and Sundays, and the legally observed holidays of New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
The rates set forth in this Schedule are based upon delivery and measurement of energy at the same voltage. When the measurement of energy occurs at a voltage different than the delivery voltage, the measurement of energy will be compensated to the delivery voltage. At the sole discretion of the Company, such compensation may be achieved through the use of loss compensating equipment, the use of formulas to calculate losses, or the application of multipliers to the metered quantities. In such cases, metered KWH, KW and KVAR will be adjusted for billing purposes. In cases where multipliers are used to adjust metered usage, the adjustment shall be as follows:
(a) Measurements taken at the low-side of a customer-owned transformer will be multiplied by 1.01.
(b) Measurements taken at the high-side of a Company-owned transformer will be multiplied by 0.98.
TERM
The term shall be as contained in the agreement for electric service, between the Company and each city, county, and town governmental authority, for service after July 1, 2002. Further written agreements may be required pursuant to the Extension of Service provision of that agreement.
A contract capacity will be required for customers with annual average demands greater than 500 KW.
The Company shall not be required to supply capacity in excess of that contract capacity except by mutual agreement.
SPECIAL TERMS AND CONDITIONS
This Schedule is subject to all terms and conditions contained in the agreement for electric service between the Company and each city, county, and town governmental authority for service after July 1, 2002.
Customers with cogeneration and/or small power production facilities shall take service by special agreement with the Company.
APPALACHIAN POWER COMPANY 2nd Revision of
d/b/a American Electric Power Sheet No. 3-1
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE G.S.-T.O.D. P.A.
(General Service Time-of-Day – Public Authority)
AVAILABILITY OF SERVICE
Available for general service to municipal corporations and state governmental entities, excluding Public Housing Authorities and the Commonwealth of Virginia, as those terms are used in §§56-232 and 234 of the Code of Virginia and in pertinent decisions of the Supreme Court of Virginia, who take Public Authority Service from the Company and are served at the secondary or primary delivery voltage levels with normal maximum demands less than 500 KW. Availability of service under this Schedule is restricted to the first fifty (50) customers applying for service.
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
237 |
Secondary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
18.90 |
18.90 |
|
|
On-peak Energy Charge (¢/kWh) |
1.694 |
0.788 |
0.182 |
2.170 |
4.834 |
|
|
Off-peak Energy Charge (¢/kWh) |
1.240 |
-- |
-- |
-- |
1.240 |
|
|
Primary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
56.40 |
56.40 |
|
|
On-peak Energy Charge (¢/kWh) |
1.643 |
0.766 |
0.176 |
1.891 |
4.476 |
|
|
Off-peak Energy Charge (¢/kWh) |
1.179 |
-- |
-- |
-- |
1.179 |
Generation Levelized Fuel Factor ......................................................................................... 1.300¢ per KWH
For the purpose of this Schedule, the on-peak billing period is defined as 7 a.m. to 8 p.m., local time, for all weekdays, Monday through Friday. The off-peak billing period is defined as 8 p.m. to 7 a.m., local time, for all weekdays, all hours of the day on Saturdays and Sundays, and the legally observed holidays of New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
MINIMUM CHARGE
This Schedule is subject to a minimum monthly charge equal to the Customer Charge.
PAYMENT
Bills are due upon presentation and payable by mail, checkless payment plan, electronic payment plan, or at authorized payment agents of the Company by the next bill date. On all accounts not so paid, a charge of 1½% per month will be applied to any account balances not received by the Company by the next bill date. If the Company fails to mail bills promptly after the billing date, the due date will be extended accordingly. The customer may designate its billing address.
APPALACHIAN POWER COMPANY Sheet No. 3-2
d/b/a American Electric Power
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE G.S.-T.O.D. P.A.
(General Service Time-of-Day – Public Authority)
(continued)
METERED VOLTAGE ADJUSTMENT
The rates set forth in this Schedule are based upon delivery and measurement of energy at the same voltage. When the measurement of energy occurs at a voltage different than the delivery voltage, the measurement of energy will be compensated to the delivery voltage. At the sole discretion of the Company, such compensation may be achieved through the use of loss compensating equipment, the use of formulas to calculate losses, or the application of multipliers to the metered quantities. In such cases, metered KWH will be adjusted for billing purposes. In cases where multipliers are used to adjust metered usage, the adjustment shall be as follows:
(a) Measurements taken at the low-side of a customer-owned transformer will be multiplied by 1.01.
(b) Measurements taken at the high-side of a Company-owned transformer will be multiplied by 0.98.
SEPARATE METERING PROVISION
Customers shall have the option of receiving service under the appropriate Public Authority Schedule for general use load by separately wiring such load to the appropriate metering based on the size of the load.
The term shall be as contained in the agreement for electric service, between the Company and each city, county, and town governmental authority, for service after July 1, 2002. Further written agreements may be required pursuant to the Extension of Service provision of that agreement.
SPECIAL TERMS AND CONDITIONS
This Schedule is subject to all terms and conditions contained in the agreement for electric service between the Company and each city, county, and town governmental authority for service after July 1, 2002.
Customers with cogeneration and/or small power production facilities shall take service by special agreement with the Company.
APPALACHIAN POWER COMPANY Sheet No. 4-1
d/b/a American Electric Power
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE L.G.S. P.A.
(Large General Service – Public Authority)
AVAILABILITY OF SERVICE
Available for general service to municipal corporations and state governmental entities, excluding Public Housing Authorities and the Commonwealth of Virginia, as those terms are used in §§56-232 and 234 of the Code of Virginia and in pertinent decisions of the Supreme Court of Virginia, who take Public Authority Service from the Company with maximum demands exceeding 25 KW per month for more that two (2) months during the past twelve (12) months, but less than 1,000 KW per month.
When a customer being served under this Schedule establishes or exceeds a normal maximum requirement of 1,000 KW per month, the customer will be placed on the appropriate L.P.S.-T.O.D. P.A. Schedule.
MONTHLY RATE
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
375 |
Secondary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
50.00 |
50.00 |
|
|
Demand Charge ($/KW) |
3.20 |
1.50 |
0.39 |
3.70 |
8.79 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
0.26 |
-- |
0.39 |
3.70 |
4.35 |
|
|
Energy Charge (¢/KWH) |
0.583 |
-- |
-- |
-- |
0.583 |
|
|
Maximum Energy Charge (¢/KWH) |
5.114 |
2.116 |
0.550 |
5.220 |
13.000 |
|
376 |
Primary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
125.00 |
125.00 |
|
|
Demand Charge ($/KW) |
3.16 |
1.46 |
0.38 |
2.87 |
7.87 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
0.20 |
2.87 |
3.07 |
|
|
Energy Charge (¢/KWH) |
0.565 |
-- |
-- |
-- |
0.565 |
|
|
Maximum Energy Charge (¢/KWH) |
5.609 |
2.291 |
0.596 |
4.504 |
13.000 |
|
377 |
Subtransmission Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
125.00 |
125.00 |
|
|
Demand Charge ($/KW) |
3.08 |
1.41 |
0.37 |
1.97 |
6.83 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
-- |
1.67 |
1.67 |
|
|
Energy Charge (¢/KWH) |
0.550 |
-- |
-- |
-- |
0.550 |
|
|
Maximum Energy Charge (¢/KWH) |
6.263 |
2.533 |
0.665 |
3.539 |
13.000 |
APPALACHIAN POWER COMPANY 2nd Revision of
d/b/a American Electric Power Sheet No. 4-2
SCHEDULE L.G.S. P.A.
(Large General Service – Public Authority)
(continued)
MONTHLY RATE (Cont’d)
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
|
Transmission Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
125.00 |
125.00 |
|
|
Demand Charge ($/KW) |
3.04 |
1.40 |
0.36 |
1.68 |
6.48 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
-- |
-- |
-- |
1.28 |
1.28 |
|
|
Energy Charge (¢/KWH) |
0.540 |
-- |
-- |
-- |
0.540 |
|
|
Maximum Energy Charge (¢/KWH) |
6.501 |
2.645 |
0.680 |
3.174 |
13.000 |
Applicable to customers 300 KW or greater:
Distribution Reactive Demand Charge for each KVAR of leading or
lagging reactive demand in excess of 50% of the KW metered demand . . . . $0.75 per KVAR
Generation Levelized Fuel Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.300¢ per KWH
MINIMUM AND MAXIMUM CHARGES
Bills computed under the above rate are subject to the operation of Minimum and Maximum Charge provisions as follows:
(a) Minimum Charge - For demand accounts up to 100 KW - the Customer Charge and all applicable adjustments.
For demand accounts over 100 KW - the sum of the Customer Charge, the product of the Demand Charge and the monthly billing demand, and all applicable adjustments.
(b) Maximum Charge - The sum of the Customer Charge, the product of the Maximum Energy Charge and the metered energy, and all applicable adjustments. This provision shall not reduce the charge below the amount specified in the Minimum Charge provision above, (a).
Bills are due upon presentation and payable by mail, checkless payment plan, electronic payment plan, or at authorized payment agents of the Company by the next bill date. On all accounts not so paid, a charge of 1½% per month will be applied to any account balances not received by the Company by the next bill date. If the Company fails to mail bills promptly after the billing date, the due date will be extended accordingly. The customer may designate its billing address.
APPALACHIAN POWER COMPANY Sheet No. 4-3
d/b/a American Electric Power
PUBLIC AUTHORITY TARIFF NO. 18
SCHEDULE L.G.S. P.A.
(Large General Service – Public Authority)
(continued)
MEASUREMENT AND DETERMINATION OF BILLING DEMAND
The billing demand in KW shall be taken each month as the single highest 15-minute peak in KW as registered during the month by a demand meter or indicator.
For accounts over 100 KW, the monthly billing demand established hereunder shall not be less than 60% of the greater of (a) the customer’s contract capacity in excess of 100 KW, or (b) the customer’s highest previously established monthly billing demand during the past 11 months in excess of 100 KW.
For accounts 300 KW or greater, the reactive demand in KVAR shall be taken each month as the single highest 15-minute peak in KVAR as registered during the month by a demand meter or indicator.
Billing demands shall be rounded to the nearest whole KW and KVAR.
OPTIONAL TIME-OF-DAY PROVISION
Available to customers who operate primarily during the off-peak period (as set forth below) and request the installation of time-of-day metering in order to receive service under this provision. The customer shall be required to pay any necessary additional metering cost.
For the purpose of this provision, the monthly billing demand as defined above shall be determined during the on-peak period. The off-peak excess demand shall be the amount by which the demand created during the off-peak period exceeds the monthly billing demand.
For the purpose of this provision, the on-peak billing period is defined as 7 a.m. to 8 p.m., local time, for all weekdays, Monday through Friday. The off-peak billing period is defined as 8 p.m. to 7 a.m., local time, for all weekdays, all hours of the day on Saturdays and Sundays, and the legally observed holidays of New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
METERED VOLTAGE ADJUSTMENT
The rates set forth in this Schedule are based upon delivery and measurement of energy at the same voltage. When the measurement of energy occurs at a voltage different than the delivery voltage, the measurement of energy will be compensated to the delivery voltage. At the sole discretion of the Company, such compensation may be achieved through the use of loss compensating equipment, the use of formulas to calculate losses, or the application of multipliers to the metered quantities. In such cases, metered KWH, KW and KVAR will be adjusted for billing purposes. In cases where multipliers are used to adjust metered usage, the adjustment shall be as follows:
(a) Measurements taken at the low-side of a customer-owned transformer will be multiplied by 1.01.
(b) Measurements taken at the high-side of a Company-owned transformer will be multiplied by 0.98.
TERM
The term shall be as contained in the agreement for electric service, between the Company and each city, county, and town governmental authority, for service after July 1, 2002. Further written agreements may be required pursuant to the Extension of Service provision of that agreement.
A contract capacity will be required for customers with annual average demands greater than 500 KW.
The Company shall not be required to supply capacity in excess of that contract capacity except by mutual agreement.
SPECIAL TERMS AND CONDITIONS
This Schedule is subject to all terms and conditions contained in the agreement for electric service between the Company and each city, county, and town governmental authority for service after July 1, 2002.
Customers with cogeneration and/or small power production facilities shall take service by special agreement with the Company.
APPALACHIAN POWER COMPANY Sheet No. 5-1
d/b/a American Electric Power
PUBLIC AUTHORITY TARIFF NO. 9
SCHEDULE L.P.S.-T.O.D. P.A.
(Large Power Service Time-of-Day – Public Authority)
AVAILABILITY OF SERVICE
Available for general service to municipal corporations and state governmental entities, excluding Public Housing Authorities and the Commonwealth of Virginia, as those terms are used in §§56-232 and 234 of the Code of Virginia and in pertinent decisions of the Supreme Court of Virginia, with normal maximum demands greater than 1,000 KW who take Public Authority Service from the Company. Each customer shall establish a contract capacity for a definite amount of electrical capacity in kilowatts which shall be sufficient to meet the customer's normal maximum requirements for the on-peak period and a definite amount of electrical capacity in kilowatts which shall be sufficient to meet normal maximum requirements for the off-peak period, but in no case shall the contract capacity be less than 1,000 KW. The Company shall not be required to supply capacity in excess of the on-peak and off-peak capacities. Contract capacities shall be in multiples of 100 KW.
MONTHLY RATE
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
301 |
Secondary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
320.00 |
320.00 |
|
|
Demand Charge ($/KW) |
4.70 |
1.55 |
0.65 |
2.41 |
9.31 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
2.02 |
-- |
0.65 |
2.41 |
5.08 |
|
|
Energy Charge (¢/KWH) |
0.267 |
-- |
-- |
-- |
0.267 |
|
307 |
Primary Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
530.00 |
530.00 |
|
|
Demand Charge ($/KW) |
4.56 |
1.50 |
0.64 |
1.64 |
8.34 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
1.31 |
-- |
0.64 |
1.64 |
3.59 |
|
|
Energy Charge (¢/KWH) |
0.261 |
-- |
-- |
-- |
0.261 |
|
|
Subtransmission Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
530.00 |
530.00 |
|
|
Demand Charge ($/KW) |
4.39 |
1.45 |
0.61 |
0.75 |
7.20 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
0.59 |
-- |
0.61 |
0.75 |
1.95 |
|
|
Energy Charge (¢/KWH) |
0.255 |
-- |
-- |
-- |
0.255 |
d/b/a American Electric Power Sheet No. 5-2
SCHEDULE L.P.S.-T.O.D. P.A.
(Large Power Service Time-of-Day – Public Authority)
(continued)
MONTHLY RATE (Cont’d)
|
Schedule Code |
|
Generation |
OATT Transmission |
Retail Transmission |
Distribution |
Total |
|
|
Transmission Voltage: |
|
|
|
|
|
|
|
Customer Charge ($) |
-- |
-- |
-- |
530.00 |
530.00 |
|
|
Demand Charge ($/KW) |
4.37 |
1.43 |
0.55 |
.48 |
6.83 |
|
|
Off-Peak Excess Demand Charge ($/KW) |
0.47 |
-- |
0.55 |
0.48 |
150 |
|
|
Energy Charge (¢/KWH) |
0.251 |
-- |
-- |
-- |
0.251 |
Distribution Reactive Demand Charge for each KVAR of leading or
lagging reactive demand in excess of 50% of the KW metered demand . . . . . . . . . . . . . . . . . . . $0.75 per KVAR
Generation Levelized Fuel Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.300¢ per KWH
MINIMUM CHARGE
This Schedule is subject to a minimum monthly charge equal to the sum of the Customer Charge, the product of the Demand Charge and the monthly billing demand, and all applicable adjustments.
PAYMENT
Bills are due upon presentation and payable by mail, checkless payment plan, electronic payment plan, or at authorized payment agents of the Company by the next bill date. On all accounts not so paid, a charge of 1½% per month will be applied to any account balances not received by the Company by the next bill date. If the Company fails to mail bills promptly after the billing date, the due date will be extended accordingly. The customer may designate its billing address.
MEASUREMENT AND DETERMINATION OF BILLING DEMAND
The billing demand in KW shall be taken each month as the single highest 30-minute peak in KW as registered during the month in the on-peak period by a demand meter or indicator. The monthly billing demand established hereunder shall not be less than 60% of the greater of (a) the customer’s on-peak contract capacity, or (b) the customer’s highest previously established monthly billing demand during the past 11 months.
The off-peak billing demand in KW shall be taken each month as the single highest 30-minute peak in KW as registered during the month in the off-peak period by a demand meter or indicator. The monthly off-peak billing demand established hereunder shall not be less than 60% of the greater of (a) the customer’s off-peak contract capacity or (b) the customer’s highest previously established off-peak monthly billing demand during the past 11 months.
The off-peak excess demand shall be the amount by which the monthly off-peak billing demand exceeds the monthly billing demand.
The reactive demand in KVAR shall be taken each month as the single highest 30-minute peak in KVAR as registered during the month by a demand meter or indicator.
Billing demands shall be rounded to the nearest whole KW and KVAR.
d/b/a American Electric Power
SCHEDULE L.P.S.-T.O.D. P.A.
(Large Power Service Time-of-Day – Public Authority)
(continued)
MEASUREMENT AND DETERMINATION OF BILLING DEMAND (Cont’d)
For the purpose of this Schedule, the on-peak billing period is defined as 7 a.m. to 8 p.m., local time, for all weekdays, Monday through Friday. The off-peak billing period is defined as 8 p.m. to 7 a.m., local time, for all weekdays, all hours of the ay on Saturdays and Sundays, and the legally observed holidays of New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
METERED VOLTAGE ADJUSTMENT
The rates set forth in this Schedule are based upon the delivery and measurement of energy at the same voltage. When the measurement of energy occurs at a voltage different than the delivery voltage, the measurement of energy will be compensated to the delivery voltage. At the sole discretion of the Company, such compensation may be achieved through the use of loss compensating equipment, the use of formulas to calculate losses, or the application of multipliers to the metered quantities. In such cases, metered KWH, KW and KVAR will be adjusted for billing purposes. In cases where multipliers are used to adjust metered usage, the adjustment shall be as follows:
(a) Measurements taken at the low-side of a customer-owned transformer will be multiplied by 1.01.
(b) Measurements taken at the high-side of a Company-owned transformer will be multiplied by 0.98.
TERM
The term shall be as contained in the agreement for electric service, between the Company and each city, county, and town governmental authority, for service after July 1, 2002. Further written agreements may be required pursuant to the Extension of Service provision of that agreement.
The Company shall not be required to supply capacity in excess of the contract capacity except by mutual agreement.
This Schedule is subject to all terms and conditions contained in the agreement for electric service between the Company and each city, county, and town governmental authority for service after July 1, 2002.
Customers with cogeneration and/or small power production facilities shall take service by special agreement with the Company.