Email Sign-Up
Sign up for A-Mail to receive news and updates.
Click here >>
RELEASE
brown-horizontal-line

Albemarle County Newsroom

brown-horizontal-line

East Rio Road to Close October 11 for Construction
10/8/2010

Traffic will switch to Meadow Creek Parkway as temporary detour overnight Monday

Traffic will be moved from East Rio Road onto the Meadow Creek Parkway as a temporary detour on Monday, Oct. 11 so a section of East Rio Road can be rebuilt to complete the northern connection with the parkway project. The traffic switch will be done overnight Monday and the detour will be in place by Tuesday morning.

East Rio Road will be closed to traffic between Dunlora Drive and a point west of the intersection of East Rio Road and Pen Park Road. All private entrances along East Rio Road will remain open during the six-week closure. Local traffic will be able to travel East Rio Road between Melbourne Road and Pen Park Road.

During the construction traffic will be directed from East Rio Road onto the Meadow Creek Parkway. The detour will send traffic south to Melbourne Road, where motorists will turn left to return to Park Street. Traffic traveling north on Park Street should turn left at Melbourne Road and right onto the Meadow Creek Parkway to East Rio Road. Motorists should also consider using alternate routes such as Route 29 and Route 250.

A new traffic signal at the intersection of Melbourne Road and the Meadow Creek Parkway will control the flow of traffic onto Melbourne Road during the detour. The Virginia Department of Transportation (VDOT) is coordinating the road closure and detour with Albemarle County and the city of Charlottesville to minimize the effect on residents and motorists.

Once the realignment and rebuilding of East Rio Road is finished the road will be reopened to traffic and the Meadow Creek Parkway will be closed so that remaining work on the project can be completed.

The $11.8 million project is building a new 1.4-mile, two-lane parkway from East Rio Road south to the Charlottesville city limits at Melbourne Road. It also includes the upcoming reconstruction of a portion of East Rio Road and replacement and widening of the bridge over the Norfolk Southern Railroad tracks. In addition to the parkway a 10-foot-wide paved pedestrian path will roughly parallel the road project through a linear park between Melbourne Road and East Rio Road. The path will be connected with the Rivanna Trails network when the project is finished.

The project, which is being built by Faulconer Construction Co. Inc, of Charlottesville, is scheduled for completion on Oct. 14, 2011.

More information about the Meadow Creek Parkway project is available on VDOT’s web site:
http://www.virginiadot.org/projects/culpeper/meadowcreek.asp


Return to Newsroom

 
Featured Events
Board of Supervisors Adjourned Meeting - Development Advisory Services Work Session
11/16/2017, 3:30 PM
Lane Auditorium (COB)
Places29-North Community Advisory Committee
11/16/2017, 6:00 PM
5th & Avon Community Advisory Committee
11/16/2017, 7:00 PM
Places29-Hydraulic Community Advisory Committee
11/20/2017, 5:30 PM
Planning Commission Meeting
11/21/2017, 6:00 PM
Lane Auditorium (COB)
Thanksgiving Holiday
11/22/2017, 12:00 PM
Various Locations

View All >>
 
Links of Interest